Layton City   search site  
Home Do Business Live & Work Play Departments Services & Payments Contact Us Follow Layton City Twitter Like Us on Facebook
   
  Skip Navigation Links Home Departments Legal Municipal Code
  Legal Department
 

Back To Title List | Chapter List | Section List

18.36.180. Installation of development fencing

            (1)        Any fence that is required to be installed either as a condition attached to the approval of a development, or as required by Title 19 of the Layton Municipal Code, shall be completed immediately after the rough grading of the site, but not later than thirty (30) days after issuance of the development permit.

            (2)        Extensions.  Extensions to the time frame set forth in Subsection (1) above may be granted by the Community and Economic Development Director in limited circumstances.  In requesting an extension an applicant must submit a grading plan and demonstrate that, based on topography or other unique features of the property, the requirements of Subsection (1) cannot be met.  Further, no such extension will be granted unless the applicant posts a bond in an amount sufficient to construct the required fencing, owns the properties on each side of the property line where the fence is to be installed, and that such property is within an accepted PRUD plan or subject to the foothill regulations.  If such an extension is granted, a specific time period shall be established.  However, no building permit shall be released for the development until the required fencing has been installed.


Ord. No.97-35, Recodified, 6/19/1997
Ord. No. 97-38, Amended, 8/27/1997

Municipal Code (PDF Format)



 
 
Index Contact Us Site Credits Privacy and Security Statement
Top